Community
1 · Photo inOne photo of your product
3 · The filmA film, made on OBJEKT

Your photo
How it was made
1 · Photo inOne photo of your productThe recipe
2 · The brief[Global Setup] Room@image_1 is the single uploaded finished-interior photo and the authority for the final design. Preserve its architecture, proportions, windows, openings, visible view, materials, lighting and actual furnishings. Use only furniture and fixtures visible in the upload; skip categories absent from it. No named city, landmark or preset decor.
A 15-second fast-paced timelapse video showing the room from the attached reference image being built and finished; starting from an empty space (or early construction stage) and progressing to the fully completed design shown in the image.
Shot style: Quick, intercut shots in varied B-roll style; different angles of the same space (wide shot, angled shot, close-up on a detail being installed, overhead or side angle), each shot capturing a different stage of construction/finishing: flooring installation, wall/decor work, painting, lighting installation, furniture and final details placement. Shots alternate quickly with clear visual variety, no repeated angles.
Transitions: Professional, seamless transitions between shots (match cut, whip pan, or motion cut) so each cut feels like a natural continuation of the build process.
Ending: Final shot is a light, professional zoom-out revealing the fully completed space.
Camera movement: Continuous camera motion in every shot (no fully static shots); light dolly, pan, or tilt for a dynamic feel.
Audio: No music at all. Realistic diegetic sound only, generated by the actual actions in each shot; construction tool sounds, hammering, paint being applied, flooring/detail installation sounds, footsteps and worker movement, ambient site/workshop tone, and a light whoosh on each transition. Every sound must be tightly synced and physically logical with the on-screen action.
Requirements:
Speed ramping between fast and slow motion; faster during build/install shots, slight slow-down at key moments and on the final shot
High realism in lighting, texture, motion, and sound
Professional cinematic output with consistent color grading throughout
Timing: complete the visible construction and furnishing by second 11. Reserve seconds 11-15 for the unobstructed finished room with a slow zoom-out. Every object is carried into position by visible workers before it is set down. Flooring is installed, walls are finished, fittings are attached and furniture arrives. Distinct operations must visibly change the unfinished room. No wiping montage on an already-finished space; no teleporting furniture; no morphs or dissolves that replace actual work. End with workers out of frame. No captions, text overlays, logos or watermarks.
3 · The filmA film, made on OBJEKTNotes 0
No notes yet. Say something to OBJEKT.

